Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the gd-system-plugin domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/wp-includes/functions.php on line 6114
What we do - NRG Engineering

What we do

Our proposed range of services are optimised to fit our clients’ needs. 

We support clients throughout all stages of a project’s life-cycle – from conceptual design to decommissioning.

nrg-service-3
Drilling Campaigns
  • Seismic Campaigns
  • Drilling Campaigns
  • Geoscience
Engineering, Procurement, Constructions, Commissioning, Installation (EPCCI) Support 
  • FPSO Packages
  • SURF Packages
  • SPS Packages
  • LNG Packages
Production Asset Operations and Maintenance
  • Onshore
  • Offshore
Background
We take pride in our works

OUR PORTFOLIO

Exploration Support Services

Seismic Campaigns
Geophysics, Operations, Interpretation, Technical Assistance, Oceanographic and Weather Studies
CGG, Nordic Maritime, PTSC
Contract Duration: 1.5 years
Drilling Campaigns
Operations and QHSE bridging documents,
Technical Assistance, Weather Forecast Services
Maersk Drilling, KCA
Contract Duration: 2 years

Engineering, Procurement, Construction,
Commissioning, Installation (EPCCI) Support Services

FPSO Packages
Technical Assistance, Construction, Integration, Commissioning, Installation, Start-up
Total, OSX, PTSC, Premier Oil, Modec, SBM
Contract Duration: 1 to 5 years
SURF Packages
Technical Assistance, FEED, Construction, Installation, Quality Control, QHSE
TechnipFMC, McDermott, Saipem, Subsea 7, HHI
Contract Duration: 1 to 3 years
FPSO/Semi-Sub Packages
Technical Assistance, Project Management, Construction, Installation, QHSE
Shell, MISC, MMHE, TechnipFMC
Contract Duration: 1 to 5 years
SURF/SPS Packages
Technical Assistance, Interface Management, Installation, QHSE, Quality Control
Total, Aker Solutions
Contract Duration: 1 to 3 years

Operations & Maintenance Services

Operations & Maintenance
Management, Technical Assistance
Total  – Girassol FPSO
Contract Duration: 3 to 5 years
Safety Case Management
Hazard analysis, Safety Critical Element, ALARP etc
BW Offshore, PTSC, Prosafe, Rubicon, Premier Oil
Contract Duration: up to 2 years

Skills Development & Technical Training

FPSO Operations & Maintenance Training
Trained 300 engineers to operate Chevron’s Agbami FPSO in Nigeria
Chevron, Cegelec
Contract Duration: 4 years
Offshore Pipeline Training
Various training programs for engineering departments for Deep-Sea installation projects
Saipem
Contract Duration: up to 6 months
Background
Companies that trust us

OUR CLIENTS